Login / Signup
A two-stage heuristic for disassembly scheduling with assembly product structure.
Dong-Ho Lee
Paul C. Xirouchakis
Published in:
J. Oper. Res. Soc. (2004)
Keyphrases
</>
scheduling problem
simulated annealing
constraint satisfaction
optimal solution
search algorithm
dynamic programming
iterative repair
tree structure
resource allocation
life cycle
combinatorial optimization
scheduling algorithm
reverse engineering
earth observing
list scheduling