A co-evolutionary genetic algorithm for the two-machine flow shop group scheduling problem with job-related blocking and transportation times.
Shuaipeng YuanTieke LiBailin WangPublished in: Expert Syst. Appl. (2020)
Keyphrases
- scheduling problem
- processing times
- flowshop
- genetic algorithm
- single machine
- job shop scheduling problem
- tabu search
- job shop
- identical parallel machines
- release dates
- setup times
- np hard
- maximum lateness
- limited capacity
- parallel machine scheduling problem
- precedence constraints
- single machine scheduling problem
- completion times
- job processing times
- total weighted tardiness
- permutation flowshop
- scheduling jobs
- identical machines
- multi objective
- neural network
- minimizing makespan
- fitness function
- squeaky wheel
- strongly np hard
- transportation systems
- sequence dependent setup times
- simulated annealing
- parallel genetic algorithm
- upper bound
- ant colony optimization