Joint scheduling of jobs and Preventive Maintenance operations in the flowshop sequencing problem: a resolution with sequential and integrated strategies.
Fatima Benbouzid-SitayebSid Ali GuebliYassine BessadiChristophe VarnierNoureddine ZerhouniPublished in: Int. J. Manuf. Res. (2011)
Keyphrases
- preventive maintenance
- flowshop
- scheduling problem
- processing times
- special case
- total tardiness
- bicriteria
- setup times
- sequence dependent setup times
- maximum lateness
- flowshop scheduling
- minimizing makespan
- tabu search
- parallel machines
- total weighted tardiness
- single machine
- permutation flowshop
- unrelated parallel machines
- makespan minimization
- job processing times
- job shop
- np hard
- number of tardy jobs
- flowshop scheduling problems
- strongly np hard
- identical parallel machines
- minimizing total tardiness
- completion times
- precedence constraints
- ant colony optimization
- job shop scheduling problem
- optimal strategy