Sign in

Application of BIM application benefit evaluation model based on fuzzy AHP in the whole life cycle of tunnel engineering.

Xiaohong WuHaifeng WuChenwen Zhan
Published in: Int. J. Wirel. Mob. Comput. (2023)
Keyphrases
  • life cycle
  • artificial intelligence