Login / Signup

Performance prediction of a reconfigurable high voltage substation simulator: a case study using SWN.

Cosimo AnglanoSusanna DonatelliGiuliana FranceschinisOliver Botti
Published in: PNPM (1997)
Keyphrases
  • high voltage
  • simulation model
  • prediction accuracy
  • test bed
  • operating conditions
  • case study
  • low cost
  • prediction model
  • partial discharge
  • normal operation
  • neural network
  • multi class
  • evolutionary computation