Login / Signup

Simulation-based evaluation of fuel consumption in heavy construction projects by monitoring equipment idle times.

Reza AkhavianAmir H. Behzadan
Published in: WSC (2013)
Keyphrases
  • fuel consumption
  • real time
  • optimization model
  • tuning parameters