Login / Signup

Availability Study of the Italian Electricity SCADA System in the Cloud.

Stefano SebastioAntonio ScalaGregorio D'Agostino
Published in: CRITIS (2016)
Keyphrases
  • high speed
  • empirical studies
  • control system
  • genetic algorithm
  • artificial intelligence
  • information technology
  • long term
  • statistical analysis
  • experimental study
  • simulation study
  • data center
  • electric power