Login / Signup

A bi-level model integrating planning and scheduling for the optimization of process operation and energy consumption of a PVC plant under uncertainty.

Jian SuYuhong Wang
Published in: Comput. Chem. Eng. (2022)
Keyphrases
  • energy consumption
  • bi level
  • control system
  • wireless sensor networks
  • optimization model
  • data sets
  • response time
  • base station