Login / Signup
The robust (minmax regret) assembly line worker assignment and balancing problem.
Jordi Pereira
Published in:
Comput. Oper. Res. (2018)
Keyphrases
</>
assembly line
minmax regret
processing times
beam search
production line
interval data
manufacturing systems
precedence constraints
single machine scheduling problem
production system
scheduling problem
combinatorial optimization problems
optimization model
optimization criterion
special case