A bicriteria flowshop scheduling problem with setup times.
Tamer ErenErtan GünerPublished in: Appl. Math. Comput. (2006)
Keyphrases
- flowshop
- bicriteria
- setup times
- scheduling problem
- processing times
- sequence dependent setup times
- single machine
- total tardiness
- special case
- np hard
- minimizing makespan
- manufacturing cell
- precedence constraints
- maximum tardiness
- unrelated parallel machines
- parallel machines
- strongly np hard
- tabu search
- release dates
- evolutionary algorithm
- lower bound