Environmental Risk Identification and Control Strategy of Extra High Voltage AC Transmission and Substation Project Based on AHP-Fuzzy Comprehensive Evaluation Method.
Yangsen LiNengming JiangXianghua GuoJiayu ZhaoXuanbin HuXiaoyu YuChuankai RaoPublished in: ICBAR (2023)
Keyphrases
- control strategy
- high voltage
- operating conditions
- fuzzy comprehensive evaluation method
- evaluation method
- evaluation model
- control system
- mathematical model
- control algorithm
- control method
- control strategies
- control scheme
- conceptual design
- decision making
- credit risk
- speed control
- analytic hierarchy process
- force control
- fuzzy controller
- partial discharge
- predictive control
- simulation model
- marine power plant
- group decision making
- power system
- decision makers
- normal operation
- biped robot
- data mining
- machine learning