Login / Signup

CEPM 4: optimization of the waste management for construction projects using simulation.

Mala ChandrakanthiPatrick HettiaratchiBolívar PradoJanaka Y. Ruwanpura
Published in: WSC (2002)
Keyphrases
  • waste management
  • global optimization
  • optimization algorithm
  • optimization problems
  • case study
  • construction industry
  • cost benefit analysis
  • neural network
  • genetic algorithm
  • bayesian networks
  • software development