Collaborative scheduling of energy-saving spare parts manufacturing and equipment operation strategy using a self-adaptive two-stage memetic algorithm.
Qiang LuoQianwang DengHuining ZhuangGuiliang GongQing FanXiahui LiuPublished in: Robotics Comput. Integr. Manuf. (2024)
Keyphrases
- memetic algorithm
- spare parts
- energy saving
- air conditioning
- inventory management
- energy consumption
- tabu search
- optimization model
- vehicle routing
- wireless sensor networks
- scheduling problem
- vehicle routing problem
- power consumption
- evolutionary computation
- service level
- genetic algorithm
- energy efficient
- combinatorial optimization
- total cost
- high availability
- production planning
- crossover operator
- metaheuristic
- energy efficiency
- evolutionary algorithm
- expert systems