Login / Signup
The Two-stage Assembly Flow Shop Scheduling with an Availability Constraint: Worst Case Analysis.
Hatem Hadda
Najoua Dridi
Sonia Hajri-Gabouj
Published in:
J. Math. Model. Algorithms Oper. Res. (2014)
Keyphrases
</>
worst case analysis
average case
worst case
np hardness
greedy heuristic
scheduling problem
lower bound
np hard
linear programming relaxation
optimal solution
upper bound