Login / Signup

The Two-stage Assembly Flow Shop Scheduling with an Availability Constraint: Worst Case Analysis.

Hatem HaddaNajoua DridiSonia Hajri-Gabouj
Published in: J. Math. Model. Algorithms Oper. Res. (2014)
Keyphrases
  • worst case analysis
  • average case
  • worst case
  • np hardness
  • greedy heuristic
  • scheduling problem
  • lower bound
  • np hard
  • linear programming relaxation
  • optimal solution
  • upper bound