Login / Signup

Sequencing in an Assembly Line with Blocking to Minimize Cycle Time.

S. Thomas McCormickMichael L. PinedoScott ShenkerBarry Wolf
Published in: Oper. Res. (1989)
Keyphrases
  • assembly line
  • assembly line balancing
  • beam search
  • processing times
  • production line
  • manufacturing systems
  • production system
  • multiple objectives
  • precedence constraints