The two-machine flowshop scheduling problem with total tardiness.
Tapan SenParthasarati DileepanJatinder N. D. GuptaPublished in: Comput. Oper. Res. (1989)
Keyphrases
- flowshop
- total tardiness
- scheduling problem
- sequence dependent setup times
- single machine
- setup times
- parallel machines
- flowshop scheduling
- processing times
- bicriteria
- np hard
- maximum lateness
- makespan minimization
- minimizing total tardiness
- tabu search
- minimizing makespan
- special case
- total weighted tardiness
- precedence constraints
- total flowtime
- unrelated parallel machines
- strongly np hard
- preventive maintenance
- permutation flowshop
- multistage
- job processing times