Login / Signup
Analyzing a drum-buffer-rope scheduling system executability through simulation.
Servet Hasgül
Zuhal Kartal
Published in:
SCSC (2007)
Keyphrases
</>
neural network
scheduling problem
database systems
resource allocation
scheduling algorithm
simulation model
simulation models
preventive maintenance
response time
mathematical model
simulation study
mathematical models
parallel processors
flow control