Login / Signup

A Simultaneous Project Scheduling and Resource Binding Method Based on the Load-Capacity Model.

Akinori SaitoTakumi KusanagiKoichiro Ochimizu
Published in: APSEC (2011)
Keyphrases
  • probabilistic model
  • mathematical model
  • objective function
  • cost function
  • prediction model
  • project scheduling
  • neural network
  • similarity measure
  • optimization method
  • bp neural network
  • multi objective