Login / Signup

A note on two-stage hybrid flowshop scheduling with missing operations.

Chao-Tang TsengChing-Jong LiaoTai-Xiang Liao
Published in: Comput. Ind. Eng. (2008)
Keyphrases
  • flowshop scheduling
  • flowshop scheduling problems
  • case study
  • missing data
  • missing values
  • flowshop
  • data mining
  • computer vision
  • information systems
  • simulated annealing