• search
    search
  • reviewers
    reviewers
  • feeds
    feeds
  • assignments
    assignments
  • settings
  • logout

Hot-line assembly strategy for connection fittings in 110kV intelligent substation.

Mingdong TangYoulin GuShigang WangQinghua LiangXiaoxi Wang
Published in: Ind. Robot (2018)
Keyphrases
  • intelligent systems
  • decision support
  • data mining
  • neural network
  • search engine
  • case study
  • mobile robot
  • simulation model
  • optimal strategy
  • transmission line
  • hot topics