Login / Signup
Wei Li
ORCID
Publication Activity (10 Years)
Years Active: 2008-2020
Publications (10 Years): 3
Top Topics
Flowshop
Minimize Total
Completion Times
Single Machine
Top Venues
Int. J. Prod. Res.
Comput. Ind. Eng.
Eur. J. Oper. Res.
</>
Publications
</>
Honghan Ye
,
Wei Li
,
Barrie R. Nault
Trade-off balancing between maximum and total completion times for no-wait flow shop production.
Int. J. Prod. Res.
58 (11) (2020)
Wei Li
,
Barrie R. Nault
,
Honghan Ye
Trade-off balancing in scheduling for flow shop production and perioperative processes.
Eur. J. Oper. Res.
273 (3) (2019)
Honghan Ye
,
Wei Li
,
Amin Abedini
,
Barrie R. Nault
An effective and efficient heuristic for no-wait flow shop production to minimize total completion time.
Comput. Ind. Eng.
108 (2017)
Wei Li
,
Barrie R. Nault
,
Deyi Xue
,
Yiliu Tu
An efficient heuristic for adaptive production scheduling and control in one-of-a-kind production.
Comput. Oper. Res.
38 (1) (2011)
Xinggang Luo
,
Wei Li
,
Deyi Xue
,
Jiafu Tang
,
Yiliu Tu
Optimal resource allocation for hybrid flow shop in one-of-a-kind production.
Int. J. Comput. Integr. Manuf.
23 (2) (2010)
Yiliu Tu
,
Wen-Jun Zhang
,
Xiao Liu
,
Wei Li
,
Choon-Lee Chai
,
Ralph Deters
A disaster response management system based on the control systems technology.
Int. J. Crit. Infrastructures
4 (3) (2008)