Login / Signup
W. Y. Yun
Publication Activity (10 Years)
Years Active: 2005-2005
Publications (10 Years): 0
</>
Publications
</>
Bibhas Chandra Giri
,
W. Y. Yun
,
Tadashi Dohi
Optimal design of unreliable production-inventory systems with variable production rate.
Eur. J. Oper. Res.
162 (2) (2005)
B. C. Giri
,
W. Y. Yun
,
Tadashi Dohi
Optimal lot sizing in an unreliable two-stage serial production-inventory system.
Int. Trans. Oper. Res.
12 (1) (2005)