​
Login / Signup
Vahid Mohagheghi
ORCID
Publication Activity (10 Years)
Years Active: 2015-2024
Publications (10 Years): 21
Top Topics
Case Study
Construction Project
Fuzzy Sets
Cash Flow
Top Venues
Neural Comput. Appl.
Appl. Soft Comput.
Eng. Appl. Artif. Intell.
J. Intell. Fuzzy Syst.
</>
Publications
</>
Hossein Gitinavard
,
Vahid Mohagheghi
,
Seyed Meysam Mousavi
,
Ahmad Makui
A new bi-stage interactive possibilistic programming model for perishable logistics distribution systems under uncertainty.
Expert Syst. Appl.
238 (Part E) (2024)
Vahid Mohagheghi
,
Seyed Meysam Mousavi
A new model for resilient-sustainable energy project portfolio with bi-level budgeting and project manager skill utilization under neutrosophic fuzzy uncertainty: A case study.
Eng. Appl. Artif. Intell.
131 (2024)
Vahid Mohagheghi
,
Seyed Meysam Mousavi
,
Reza Shahabi-Shahmiri
Sustainable project portfolio selection and optimization with considerations of outsourcing decisions, financing options and staff assignment under interval type-2 fuzzy uncertainty.
Neural Comput. Appl.
34 (17) (2022)
Seyed Ali Mirnezami
,
Seyed Meysam Mousavi
,
Vahid Mohagheghi
An innovative interval type-2 fuzzy approach for multi-scenario multi-project cash flow evaluation considering TODIM and critical chain with an application to energy sector.
Neural Comput. Appl.
33 (7) (2021)
S. Aramesh
,
S. Meysam Mousavi
,
Vahid Mohagheghi
,
Edmundas Kazimieras Zavadskas
,
Jurgita Antucheviciene
A soft computing approach based on critical chain for project planning and control in real-world applications with interval data.
Appl. Soft Comput.
98 (2021)
Vahid Mohagheghi
,
Seyed Meysam Mousavi
A new multi-period optimization model for resilient-sustainable project portfolio evaluation under interval-valued Pythagorean fuzzy sets with a case study.
Int. J. Mach. Learn. Cybern.
12 (12) (2021)
Vahid Mohagheghi
,
Seyed Meysam Mousavi
,
Mohammad Mojtahedi
,
Sidney Newton
Introducing a multi-criteria evaluation method using Pythagorean fuzzy sets: A case study focusing on resilient construction project selection.
Kybernetes
50 (1) (2021)
Seyed Ali Mirnezami
,
Seyed Meysam Mousavi
,
Vahid Mohagheghi
A new interval type-2 fuzzy approach for multi-scenario project cash flow assessment based on alternative queuing method and dependency structure matrix with a case study.
Eng. Appl. Artif. Intell.
95 (2020)
Vahid Mohagheghi
,
S. Meysam Mousavi
D-WASPAS: Addressing Social Cognition in Uncertain Decision-Making with an Application to a Sustainable Project Portfolio Problem.
Cogn. Comput.
12 (3) (2020)
Vahid Mohagheghi
,
Seyed Meysam Mousavi
,
Mohammad Mojtahedi
,
Sidney Newton
Evaluating large, high-technology project portfolios using a novel interval-valued Pythagorean fuzzy set framework: An automated crane project case study.
Expert Syst. Appl.
162 (2020)
Vahid Mohagheghi
,
S. Meysam Mousavi
,
Mohammad Mojtahedi
Project portfolio selection problems: Two decades review from 1999 to 2019.
J. Intell. Fuzzy Syst.
38 (2) (2020)
Reza Davoudabadi
,
S. Meysam Mousavi
,
Vahid Mohagheghi
A new last aggregation method of multi-attributes group decision making based on concepts of TODIM, WASPAS and TOPSIS under interval-valued intuitionistic fuzzy uncertainty.
Knowl. Inf. Syst.
62 (4) (2020)
M. H. Haghighi
,
S. Meysam Mousavi
,
Vahid Mohagheghi
A new soft computing model based on linear assignment and linear programming technique for multidimensional analysis of preference with interval type-2 fuzzy sets.
Appl. Soft Comput.
77 (2019)
Vahid Mohagheghi
,
S. Meysam Mousavi
An analysis approach to handle uncertain multi-criteria group decision problems in the framework of interval type-2 fuzzy sets theory.
Neural Comput. Appl.
31 (8) (2019)
Amin Eshghi
,
S. Meysam Mousavi
,
Vahid Mohagheghi
A new interval type-2 fuzzy approach for analyzing and monitoring the performance of megaprojects based on earned value analysis (with a case study).
Neural Comput. Appl.
31 (9) (2019)
Yahya Dorfeshan
,
S. Meysam Mousavi
,
Vahid Mohagheghi
,
Behnam Vahdani
Selecting project-critical path by a new interval type-2 fuzzy decision methodology based on MULTIMOORA, MOOSRA and TPOP methods.
Comput. Ind. Eng.
120 (2018)
Vahid Mohagheghi
,
S. Meysam Mousavi
,
Behnam Vahdani
,
Ali Siadat
A mathematical modeling approach for high and new technology-project portfolio selection under uncertain environments.
J. Intell. Fuzzy Syst.
32 (6) (2017)
Vahid Mohagheghi
,
S. Meysam Mousavi
,
M. Aghamohagheghi
,
Behnam Vahdani
A new approach of multi-criteria analysis for the evaluation and selection of sustainable transport investment projects under uncertainty: A case study.
Int. J. Comput. Intell. Syst.
10 (1) (2017)
Vahid Mohagheghi
,
S. Meysam Mousavi
,
Behnam Vahdani
Enhancing decision-making flexibility by introducing a new last aggregation evaluating approach based on multi-criteria group decision making and Pythagorean fuzzy sets.
Appl. Soft Comput.
61 (2017)
Vahid Mohagheghi
,
S. Meysam Mousavi
,
Behnam Vahdani
Analyzing project cash flow by a new interval type-2 fuzzy model with an application to construction industry.
Neural Comput. Appl.
28 (11) (2017)
Vahid Mohagheghi
,
S. Meysam Mousavi
,
Behnam Vahdani
,
M. R. Shahriari
R&D project evaluation and project portfolio selection by a new interval type-2 fuzzy optimization approach.
Neural Comput. Appl.
28 (12) (2017)
Vahid Mohagheghi
,
S. Meysam Mousavi
,
Ali Siadat
A new approach in considering vagueness and lack of knowledge for selecting sustainable portfolio of production projects.
IEEM
(2015)