Login / Signup
Neda Karimi
Publication Activity (10 Years)
Years Active: 2010-2017
Publications (10 Years): 2
2025
2016
Top Topics
2025
2016
Metaheuristic
2025
2016
Minimizing Total Tardiness
2025
2016
Flowshop
2025
2016
Branch And Bound
Top Venues
Comput. Oper. Res.
Expert Syst. Appl.
Appl. Soft Comput.
</>
Publications
</>
Neda Karimi
,
Hamid Davoudpour
A knowledge-based approach for multi-factory production systems.
Comput. Oper. Res.
77 (2017)
Neda Karimi
,
Hamid Davoudpour
Multi-objective colonial competitive algorithm for hybrid flowshop problem.
Appl. Soft Comput.
49 (2016)
Neda Karimi
,
Hamid Davoudpour
A branch and bound method for solving multi-factory supply chain scheduling with batch delivery.
Expert Syst. Appl.
42 (1) (2015)
Neda Karimi
,
Hamid Davoudpour
A high performing metaheuristic for multi-objective flowshop scheduling problem.
Comput. Oper. Res.
52 (2014)
Saeid Fallah-Jamshidi
,
Neda Karimi
,
Mostafa Zandieh
A hybrid multi-objective genetic algorithm for planning order release date in two-level assembly system with random lead times.
Expert Syst. Appl.
38 (11) (2011)
Mostafa Zandieh
,
Neda Karimi
An adaptive multi-population genetic algorithm to solve the multi-objective group scheduling problem in hybrid flexible flowshop with sequence-dependent setup times.
J. Intell. Manuf.
22 (6) (2011)
Neda Karimi
,
Mostafa Zandieh
,
H. R. Karamooz
Bi-objective group scheduling in hybrid flexible flowshop: A multi-phase approach.
Expert Syst. Appl.
37 (6) (2010)
Saeid Fallah-Jamshidi
,
Maghsoud Amiri
,
Neda Karimi
Nonlinear continuous multi-response problems: a novel two-phase hybrid genetic based metaheuristic.
Appl. Soft Comput.
10 (4) (2010)