​
Login / Signup
Nai-Kang Yu
Publication Activity (10 Years)
Years Active: 2018-2024
Publications (10 Years): 11
Top Topics
Routing Problem
Lower Bound
Relaxation Algorithm
Top Venues
ICIC (1)
ICIC (3)
ICIC (5)
</>
Publications
</>
Shu Qian
,
Rong Hu
,
Bin Qian
,
Nai-Kang Yu
,
Qingxia Shang
A Branch and Price Heuristic Algorithm for the Vehicle Routing Problem with Time Windows.
ICIC (1)
(2024)
Jie Li
,
Nai-Kang Yu
,
Rong Hu
,
Zi-Qi Zhang
A Branch and Price Algorithm for the Two-Agent Heterogeneous Fleet Vehicle Routing Problem with Time Windows.
ICIC (1)
(2024)
Han Li
,
Bin Qian
,
Nai-Kang Yu
,
Rong Hu
,
Zuo-cheng Li
A Branch-and-Price Heuristic Algorithm for Vehicle Routing Problem with Soft Time Windows.
ICIC (1)
(2024)
Linhao Xu
,
Bin Qian
,
Rong Hu
,
Nai-Kang Yu
,
Huai-Ping Jin
Lagrange Heuristic Algorithm Incorporated with Decomposition Strategy for Green Multi-depot Heterogeneous-Fleet Vehicle Routing Problem.
ICIC (5)
(2023)
Xianlin Feng
,
Rong Hu
,
Nai-Kang Yu
,
Bin Qian
,
Chang-Sheng Zhang
Real-Time Crowdsourced Delivery Optimization Considering Maximum Detour Distance.
ICIC (1)
(2023)
Rui Liu
,
Bin Qian
,
Sen Zhang
,
Rong Hu
,
Nai-Kang Yu
Runtime Analysis of Estimation of Distribution Algorithms for a Simple Scheduling Problem.
ICIC (1)
(2023)
Fei-Long Feng
,
Bin Qian
,
Rong Hu
,
Nai-Kang Yu
,
Qingxia Shang
ADMM with SUSLM for Electric Vehicle Routing Problem with Simultaneous Pickup and Delivery and Time Windows.
ICIC (1)
(2023)
Wen Jiang
,
Rong Hu
,
Bin Qian
,
Nai-Kang Yu
,
Bo Liu
Hybrid Whale Optimization Algorithm for Solving Green Open Vehicle Routing Problem with Time Windows.
ICIC (1)
(2021)
Nai-Kang Yu
,
Rong Hu
,
Bin Qian
,
Ling Wang
An Improved Lagrangian Relaxation Algorithm for Solving the Lower Bound of Production Logistics.
ICIC (1)
(2021)
Nan Li
,
Rong Hu
,
Bin Qian
,
Nai-Kang Yu
,
Ling Wang
Hybrid Grey Wolf Optimizer for Vehicle Routing Problem with Multiple Time Windows.
ICIC (1)
(2021)
Nai-Kang Yu
,
Rong Hu
,
Bin Qian
,
Zi-Qi Zhang
,
Ling Wang
Improved Sub-gradient Algorithm for Solving the Lower Bound of No-Wait Flow-Shop Scheduling with Sequence-Dependent Setup Times and Release Dates.
ICIC (3)
(2018)