Login / Signup
Mojtaba Heydar
ORCID
Publication Activity (10 Years)
Years Active: 2013-2024
Publications (10 Years): 8
Top Topics
Supply Chain
Markov Decision Process
Infinite Horizon
Customer Demand
Top Venues
Int. J. Inf. Syst. Supply Chain Manag.
Ann. Oper. Res.
CoRR
Comput. Electron. Agric.
</>
Publications
</>
Malgorzata M. O'Reilly
,
Sebastian Krasnicki
,
James Montgomery
,
Mojtaba Heydar
,
Richard Turner
,
Pieter Van Dam
,
Peter Maree
Markov Decision Process and Approximate Dynamic Programming for a Patient Assignment Scheduling problem.
CoRR
(2024)
Mojtaba Heydar
,
Malgorzata M. O'Reilly
,
Erin Trainer
,
Mark Fackrell
,
Peter G. Taylor
,
Ali Tirdad
A stochastic model for the patient-bed assignment problem with random arrivals and departures.
Ann. Oper. Res.
315 (2) (2022)
Mojtaba Heydar
,
Elham Mardaneh
,
Ryan C. Loxton
Approximate dynamic programming for an energy-efficient parallel machine scheduling problem.
Eur. J. Oper. Res.
302 (1) (2022)
Parichehr Paam
,
Regina Berretta
,
Mojtaba Heydar
,
R. García-Flores
The impact of inventory management on economic and environmental sustainability in the apple industry.
Comput. Electron. Agric.
163 (2019)
Farnaz Ghazi Nezami
,
Mojtaba Heydar
Energy-aware Economic Production Quantity model with variable energy pricing.
Oper. Res.
19 (1) (2019)
Parichehr Paam
,
Regina Berretta
,
Mojtaba Heydar
An Integrated Loss-Based Optimization Model for Apple Supply Chain.
OR
(2017)
Matthew E. H. Petering
,
Mojtaba Heydar
,
Dietrich R. Bergmann
Mixed-Integer Programming for Railway Capacity Analysis and Cyclic, Combined Train Timetabling and Platforming.
Transp. Sci.
50 (3) (2016)
Sepideh Alavi
,
Nader Azad
,
Mojtaba Heydar
,
Hamid Davoudpour
Integrated Production, Inventory, and Location-Allocation Decisions in Designing Supply Chain Networks.
Int. J. Inf. Syst. Supply Chain Manag.
9 (4) (2016)
Sadoullah Ebrahimnejad
,
S. Meysam Mousavi
,
Reza Tavakkoli-Moghaddam
,
Mojtaba Heydar
Risk ranking in mega projects by fuzzy compromise approach: A comparative analysis.
J. Intell. Fuzzy Syst.
26 (2) (2014)
Mojtaba Heydar
,
Matthew E. H. Petering
,
Dietrich R. Bergmann
Mixed integer programming for minimizing the period of a cyclic railway timetable for a single track with two train types.
Comput. Ind. Eng.
66 (1) (2013)