​
Login / Signup
Maher Rebai
Publication Activity (10 Years)
Years Active: 2011-2018
Publications (10 Years): 3
Top Topics
Optimization Methods
Branch And Bound Algorithm
Preventive Maintenance
Wireless Sensor
Top Venues
Int. J. Sens. Networks
J. Syst. Inf. Technol.
Int. J. Distributed Sens. Networks
Comput. Oper. Res.
</>
Publications
</>
Mathieu Brévilliers
,
Julien Lepagnot
,
Lhassane Idoumghar
,
Maher Rebai
,
Julien Kritter
Hybrid differential evolution algorithms for the optimal camera placement problem.
J. Syst. Inf. Technol.
20 (4) (2018)
Matthieu Le Berre
,
Maher Rebai
,
Faicel Hnaien
,
Hichem Snoussi
A bi-objective model for wireless sensor deployment considering coverage and tracking applications.
Int. J. Sens. Networks
22 (1) (2016)
Maher Rebai
,
Hasan Murat Afsar
,
Hichem Snoussi
Exact methods for sensor deployment problem with connectivity constraint in wireless sensor networks.
Int. J. Sens. Networks
21 (3) (2016)
Matthieu Le Berre
,
Maher Rebai
,
Faicel Hnaien
,
Hichem Snoussi
A Specific Heuristic Dedicated to a Coverage/Tracking Bi-objective Problem for Wireless Sensor Deployment.
Wirel. Pers. Commun.
84 (3) (2015)
Maher Rebai
,
Matthieu Le Berre
,
Hichem Snoussi
,
Faicel Hnaien
,
Lyes Khoukhi
Sensor deployment optimization methods to achieve both coverage and connectivity in wireless sensor networks.
Comput. Oper. Res.
59 (2015)
Maher Rebai
,
Matthieu Le Berre
,
Faicel Hnaien
,
Hichem Snoussi
,
Lyes Khoukhi
A Branch and Bound Algorithm for the Critical Grid Coverage Problem in Wireless Sensor Networks.
Int. J. Distributed Sens. Networks
10 (2014)
Maher Rebai
,
Imed Kacem
,
Kondo H. Adjallah
Scheduling jobs and maintenance activities on parallel machines.
Oper. Res.
13 (3) (2013)
Maher Rebai
,
Imed Kacem
,
Kondo H. Adjallah
Earliness-tardiness minimization on a single machine to schedule preventive maintenance tasks: metaheuristic and exact methods.
J. Intell. Manuf.
23 (4) (2012)
Maher Rebai
,
Imed Kacem
,
Kondo H. Adjallah
Evolutionary Algorithm for Scheduling Production Jobs and Preventive Maintenance Activities.
Business Process Management Workshops (2)
(2011)