Login / Signup
M. T. Yazdani Sabouni
Publication Activity (10 Years)
Years Active: 2010-2018
Publications (10 Years): 1
Top Topics
Setup Times
Precedence Constraints
Flowshop
Single Machine
Top Venues
Comput. Oper. Res.
Comput. Ind. Eng.
Eur. J. Oper. Res.
</>
Publications
</>
M. T. Yazdani Sabouni
,
Rasaratnam Logendran
Lower bound development in a flow shop electronic assembly problem with carryover sequence-dependent setup time.
Comput. Ind. Eng.
122 (2018)
M. T. Yazdani Sabouni
,
Rasaratnam Logendran
Carryover sequence-dependent group scheduling with the integration of internal and external setup times.
Eur. J. Oper. Res.
224 (1) (2013)
M. T. Yazdani Sabouni
,
Rasaratnam Logendran
A single machine carryover sequence-dependent group scheduling in PCB manufacturing.
Comput. Oper. Res.
40 (1) (2013)
M. T. Yazdani Sabouni
,
Fariborz Jolai
,
S. Afshin Mansouri
Heuristics for minimizing total completion time and maximum lateness on identical parallel machines with setup times.
J. Intell. Manuf.
21 (4) (2010)