Login / Signup
Laith A. Hadidi
ORCID
Publication Activity (10 Years)
Years Active: 2008-2024
Publications (10 Years): 4
Top Topics
Production Scheduling
Makespan Minimization
Fuzzy Inference
Construction Industry
Top Venues
Int. J. Syst. Assur. Eng. Manag.
Eng. Appl. Artif. Intell.
Int. J. Inf. Technol. Proj. Manag.
IEEM
</>
Publications
</>
Yaman Saeid Al-Nahhas
,
Laith A. Hadidi
,
Muhammad Saiful Islam
,
Martin Skitmore
,
Ziyad Abunada
Modified Mamdani-fuzzy inference system for predicting the cost overrun of construction projects.
Appl. Soft Comput.
151 (2024)
Laith A. Hadidi
,
Ahmed M. Ghaithan
,
Awsan Mohammed
,
Naif Alhwoaikan
A Markov-based model to mitigate human errors occurrence during maintenance activities in petrochemical systems.
Int. J. Syst. Assur. Eng. Manag.
14 (6) (2023)
Ibrahim S. Zaqout
,
Muhammad Saiful Islam
,
Laith A. Hadidi
,
Ronald Martin Skitmore
Modeling bidding decisions and bid markup size for construction projects: A fuzzy approach.
Eng. Appl. Artif. Intell.
113 (2022)
Ahmed Almatari
,
Ahmed M. Ghaithan
,
Awsan Mohammed
,
Laith A. Hadidi
Exploring the Influence of Project Management Offices in Project-Based Organizations in Saudi Arabia.
Int. J. Inf. Technol. Proj. Manag.
13 (1) (2022)
Laith A. Hadidi
Determining the optimal manufacturing tolerance for a single machine with deteriorating processing times.
IEEM
(2015)
Laith A. Hadidi
,
Umar Al-Turki
,
Abdur Rahim
Practical implications of managerial decisions to integrate production scheduling and maintenance.
Int. J. Syst. Assur. Eng. Manag.
6 (3) (2015)
Laith A. Hadidi
,
Abdur Rahim
Reliability for multiple units adopting sequential imperfect maintenance policies.
Int. J. Syst. Assur. Eng. Manag.
6 (2) (2015)
Laith A. Hadidi
,
Umar Al-Turki
,
Abdur Rahim
An integrated cost model for production scheduling and perfect maintenance.
Int. J. Math. Oper. Res.
3 (4) (2011)
Laith A. Hadidi
,
Ibrahim A. Rawabdeh
Economic analysis for agility in manufacturing environment.
Int. J. Comput. Appl. Technol.
32 (3) (2008)