Login / Signup
Irem Otay
ORCID
Publication Activity (10 Years)
Years Active: 2014-2024
Publications (10 Years): 15
Top Topics
Interval Valued
Intuitionistic Fuzzy
Lead Time
Center Location
Top Venues
J. Enterp. Inf. Manag.
Inf. Sci.
J. Intell. Fuzzy Syst.
Soft Comput.
</>
Publications
</>
Irem Otay
,
Sezi Çevik Onar
,
Basar Öztaysi
,
Cengiz Kahraman
Evaluation of sustainable energy systems in smart cities using a Multi-Expert Pythagorean fuzzy BWM & TOPSIS methodology.
Expert Syst. Appl.
250 (2024)
Irem Otay
Tech-center location selection by interval-valued spherical fuzzy AHP based MULTIMOORA methodology.
Soft Comput.
27 (15) (2023)
Irem Otay
,
Sezi Çevik Onar
,
Basar Öztaysi
,
Cengiz Kahraman
A novel interval valued circular intuitionistic fuzzy AHP methodology: Application in digital transformation project selection.
Inf. Sci.
647 (2023)
Bersam Bolat
,
Irem Otay
,
Gül Tekin Temur
,
Sükrü Imre
An Integrated Fuzzy Multi-Criteria Approach for E-Waste Collection Center Location Problem.
Int. J. Fuzzy Syst. Appl.
10 (2) (2021)
Irem Otay
,
Miguel Jaller
Multi-expert disaster risk management & response capabilities assessment using interval-valued intuitionistic fuzzy sets.
J. Intell. Fuzzy Syst.
38 (1) (2020)
Irem Otay
,
Miguel Jaller
A novel pythagorean fuzzy AHP and TOPSIS method for the wind power farm location selection problem.
J. Intell. Fuzzy Syst.
39 (5) (2020)
Irem Otay
,
Embiye Senturk
,
Ferhan Çebi
An integrated fuzzy approach for classifying slow-moving items.
J. Enterp. Inf. Manag.
31 (4) (2018)
Irem Otay
,
Cengiz Kahraman
Six Sigma Project Selection Using Interval Neutrosophic TOPSIS.
EUSFLAT/IWIFSGN (3)
(2017)
Irem Otay
,
Basar Öztaysi
,
Sezi Çevik Onar
,
Cengiz Kahraman
Multi-expert performance evaluation of healthcare institutions using an integrated intuitionistic fuzzy AHP&DEA methodology.
Knowl. Based Syst.
133 (2017)
Irem Otay
,
Ferhan Çebi
A multiobjective fuzzy mathematical model for a supply chain problem with the forward and reverse flows.
Int. J. Inf. Decis. Sci.
8 (4) (2016)
Ferhan Çebi
,
Irem Otay
A two-stage fuzzy approach for supplier evaluation and order allocation problem with quantity discounts and lead time.
Inf. Sci.
339 (2016)
Irem Otay
,
Cengiz Kahraman
Multicriteria Bottle Design in the Beverage Industry Using Interval-Valued Intuitionistic Fuzzy Sets.
J. Multiple Valued Log. Soft Comput.
27 (5-6) (2016)
Ferhan Çebi
,
Irem Otay
A fuzzy multi-objective model for solving project network problem with bonus and incremental penalty cost.
Comput. Ind. Eng.
82 (2015)
Ferhan Çebi
,
Irem Otay
Multi-Criteria and Multi-Stage Facility Location Selection under Interval Type-2 Fuzzy Environment: A Case Study for a Cement Factory.
Int. J. Comput. Intell. Syst.
8 (2) (2015)
Irem Otay
,
Cengiz Kahraman
Worldwide Investing in Real Estate Using Interval-Valued Intuitionistic Fuzzy Sets.
IFSA-EUSFLAT
(2015)
Bersam Bolat
,
Ferhan Çebi
,
Gül Tekin Temur
,
Irem Otay
A fuzzy integrated approach for project selection.
J. Enterp. Inf. Manag.
27 (3) (2014)