Login / Signup
Gérald Barbier
Publication Activity (10 Years)
Years Active: 2019-2023
Publications (10 Years): 7
Top Topics
Soft Sensor
Power Plant
Ieee Lom
Incipient Fault
Top Venues
AFRICON
</>
Publications
</>
Patrice Koffi Chetangny
,
Mawuéna Medewou
,
Amèdédjihundé H. J. Hounnou
,
Jacques Gbadébo Aredjodoun
,
Kekelv Moïse Kwoasi Biramah
,
Victor Zogbochi
,
Sossou Houndedako
,
Gérald Barbier
,
Didier Chamagne
Sizing of Hybrid Photovoltaic/Diesel Power Plant for Electrification of Commune "Golfe 3" in Lomé, Togolese Republic.
AFRICON
(2023)
Patrice Koffi Chetangny
,
Victor Zogbochi
,
Mahoudjro Esli Koussouali
,
Didier Chamagne
,
Gérald Barbier
,
Sossou Houndedako
Study of Total Selectivity Between the Benin's Distribution and Transmission Networks.
AFRICON
(2023)
Patrice Koffi Chetangny
,
Kévin Elisée Sonon
,
Mèhundo Walix Leslie De
,
Victor Zogbochi
,
Jacques Gbadébo Aredjodoun
,
Amèdédjihundé H. J. Hounnou
,
Sossou Houndedako
,
Gérald Barbier
,
Didier Chamagne
ONIGBOLO's 25 MWp PV2 Solar Power Plant Connection Impact on the Stability of Benin Transmission Grid.
AFRICON
(2023)
Ulrich Thierry Prodjinotho
,
Patrice Koffi Chetangny
,
Marcaire Agbomahena
,
Victor Zogbochi
,
Mawuéna Medewou
,
Jacques Gbadébo Aredjodoun
,
Amèdédjihundé H. J. Hounnou
,
Gérald Barbier
,
Didier Chamagne
Electrical Energy Sources Management in Benin Using Dynamic Programming.
AFRICON
(2023)
Patrice Koffi Chetangny
,
Victor Zogbochi
,
Mèhundo Walix Leslie De
,
Sylvain M. Tchike
,
Amèdédjihundé H. J. Hounnou
,
Jacques Gbadébo Aredjodoun
,
Sossou Houndedako
,
Gérald Barbier
,
Didier Chamagne
Optimization of a Diesel System - Stockpiling for Supplying a Remote BTS Station.
AFRICON
(2023)
Patrice Koffi Chetangny
,
Victor Zogbochi
,
Sylvain M. Tchike
,
Amèdédjihundé H. J. Hounnou
,
Jacques Gbadébo Aredjodoun
,
Sossou Houndedako
,
Gérald Barbier
,
Didier Chamagne
,
Antoine Vianou
Assessment and Analysis of the Various Electrical System Configurations Used to Power BTS Sites in Benin.
AFRICON
(2023)
Mawuéna Medewou
,
Patrice Koffi Chetangny
,
Didier Chamagne
,
Sossou Houndedako
,
Gérald Barbier
,
Antoine Vianou
Development of the Benin, Togo and Ghana power interconnection network model at horizon 2022.
AFRICON
(2019)