Login / Signup
Engin Topan
ORCID
Publication Activity (10 Years)
Years Active: 2010-2022
Publications (10 Years): 6
Top Topics
Inventory Control
Parallel Machine Scheduling Problem
Multi Item
Setup Cost
Top Venues
Eur. J. Oper. Res.
IISE Trans.
Expert Syst. Appl.
</>
Publications
</>
Berry Gerrits
,
Engin Topan
,
M. C. van der Heijden
Operational planning in service control towers - heuristics and case study.
Eur. J. Oper. Res.
302 (3) (2022)
Oguzhan Ahmet Arik
,
Marco Schutten
,
Engin Topan
Weighted earliness/tardiness parallel machine scheduling problem with a common due date.
Expert Syst. Appl.
187 (2022)
Alp Akcay
,
Engin Topan
,
Geert-Jan van Houtum
Machine tools with hidden defects: Optimal usage for maximum lifetime value.
IISE Trans.
53 (1) (2021)
Engin Topan
,
Ayse Sena Eruguz
,
Weina Ma
,
M. C. van der Heijden
,
Rommert Dekker
A review of operational spare parts service logistics in service control towers.
Eur. J. Oper. Res.
282 (2) (2020)
Engin Topan
,
Matthieu C. van der Heijden
Operational level planning of a multi-item two-echelon spare parts inventory system with reactive and proactive interventions.
Eur. J. Oper. Res.
284 (1) (2020)
Engin Topan
,
Z. Pelin Bayindir
,
Tarkan Tan
Heuristics for multi-item two-echelon spare parts inventory control subject to aggregate and individual service measures.
Eur. J. Oper. Res.
256 (1) (2017)
Engin Topan
,
Z. Pelin Bayindir
Multi-item two-echelon spare parts inventory control problem with batch ordering in the central warehouse under compound Poisson demand.
J. Oper. Res. Soc.
63 (8) (2012)
Engin Topan
,
Zeynep Müge Avsar
An approximation for kanban controlled assembly systems.
Ann. Oper. Res.
182 (1) (2011)
Engin Topan
,
Z. Pelin Bayindir
,
Tarkan Tan
An exact solution procedure for multi-item two-echelon spare parts inventory control problem with batch ordering in the central warehouse.
Oper. Res. Lett.
38 (5) (2010)