Login / Signup
Dieter Debels
Publication Activity (10 Years)
Years Active: 2005-2008
Publications (10 Years): 0
</>
Publications
</>
Mario Vanhoucke
,
José Coelho
,
Dieter Debels
,
Broos Maenhout
,
Luís Valadares Tavares
An evaluation of the adequacy of project network generators with systematically sampled networks.
Eur. J. Oper. Res.
187 (2) (2008)
Mario Vanhoucke
,
Dieter Debels
The impact of various activity assumptions on the lead time and resource utilization of resource-constrained projects.
Comput. Ind. Eng.
54 (1) (2008)
Dieter Debels
,
Mario Vanhoucke
A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem.
Oper. Res.
55 (3) (2007)
Dieter Debels
,
Bert De Reyck
,
Roel Leus
,
Mario Vanhoucke
A hybrid scatter search/electromagnetism meta-heuristic for project scheduling.
Eur. J. Oper. Res.
169 (2) (2006)
Dieter Debels
,
Mario Vanhoucke
The Electromagnetism Meta-heuristic Applied to the Resource-Constrained Project Scheduling Problem.
Artificial Evolution
(2005)
Dieter Debels
,
Mario Vanhoucke
A Bi-population Based Genetic Algorithm for the Resource-Constrained Project Scheduling Problem.
ICCSA (4)
(2005)