Login / Signup
Dhiren Kumar Behera
ORCID
Publication Activity (10 Years)
Years Active: 2013-2023
Publications (10 Years): 7
Top Topics
Hill Climbing
Parallel Machines
Strongly Np Hard
Competitive Ratio
Top Venues
Mob. Networks Appl.
SEMCCO
Int. J. Decis. Support Syst. Technol.
Symmetry
</>
Publications
</>
Shankha Shubhra Goswami
,
Dhiren Kumar Behera
Developing Fuzzy-AHP-Integrated Hybrid MCDM System of COPRAS-ARAS for Solving an Industrial Robot Selection Problem.
Int. J. Decis. Support Syst. Technol.
15 (1) (2023)
Shankha Shubhra Goswami
,
Dhiren Kumar Behera
,
Asif Afzal
,
Abdul Razak Kaladgi
,
Sher Afghan Khan
,
Parvathy Rajendran
,
Ram Subbiah
,
Mohammad Asif
Analysis of a Robot Selection Problem Using Two Newly Developed Hybrid MCDM Models of TOPSIS-ARAS and COPRAS-ARAS.
Symmetry
13 (8) (2021)
Shankha Shubhra Goswami
,
Dhiren Kumar Behera
An Analysis for Selecting Best Smartphone Model by AHP-TOPSIS Decision-Making Methodology.
Int. J. Serv. Sci. Manag. Eng. Technol.
12 (3) (2021)
Nawdha Thakoor
,
Dhiren Kumar Behera
,
Désiré Yannick Tangman
,
Muddun Bhuruth
Howard's algorithm for high-order approximations of American options under jump-diffusion models.
Int. J. Data Sci. Anal.
10 (2) (2020)
Mohammed N. M. Ali
,
M. M. Hafizur Rahman
,
Rizal Bin Mohd. Nor
,
Dhiren Kumar Behera
,
Tengku Mohd Tengku Sembok
,
Yasuyuki Miura
,
Yasushi Inoguchi
SCCN: A Time-Effective Hierarchical Interconnection Network for Network-On-Chip.
Mob. Networks Appl.
24 (4) (2019)
Mohammed N. M. Ali
,
M. M. Hafizur Rahman
,
Adamu Abubakar Ibrahim
,
Dhiren Kumar Behera
,
Yasushi Inoguchi
The connectivity and the static-cost-effective analysis of a shifted completely connected network.
Int. J. Comput. Intell. Stud.
8 (1/2) (2019)
Dipak Laha
,
Dhiren Kumar Behera
A comprehensive review and evaluation of LPT, MULTIFIT, COMBINE and LISTFIT for scheduling identical parallel machines.
Int. J. Inf. Commun. Technol.
11 (2) (2017)
Dipak Laha
,
Dhiren Kumar Behera
An Improved Cuckoo Search Algorithm for Parallel Machine Scheduling.
SEMCCO
(2014)
Dipak Laha
,
Dhiren Kumar Behera
Improved Flow Shop Schedules with Total Completion Time Criterion.
ICCSA (3)
(2013)