Login / Signup
Daryl L. Santos
Publication Activity (10 Years)
Years Active: 2005-2005
Publications (10 Years): 0
</>
Publications
</>
Masao Yokoyama
,
Daryl L. Santos
Three-stage flow-shop scheduling with assembly operations to minimize the weighted sum of product completion times.
Eur. J. Oper. Res.
161 (3) (2005)