Login / Signup
Byung-Jun Joo
Publication Activity (10 Years)
Years Active: 2009-2009
Publications (10 Years): 0
</>
Publications
</>
Yeong-Dae Kim
,
Byung-Jun Joo
,
Jong-Ho Shin
Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint.
J. Heuristics
15 (1) (2009)
Byung-Jun Joo
,
Yeong-Dae Kim
A branch-and-bound algorithm for a two-machine flowshop scheduling problem with limited waiting time constraints.
J. Oper. Res. Soc.
60 (4) (2009)