Login / Signup
Alberto Cano
Publication Activity (10 Years)
Years Active: 2011-2017
Publications (10 Years): 1
Top Topics
Hybrid Model
Case Study
Multiresolution
Dynamic Programming
Top Venues
Eur. J. Oper. Res.
CAEPIA
Eng. Appl. Artif. Intell.
APMS (1)
</>
Publications
</>
Joaquín Bautista
,
Alberto Cano
,
Rocío Alfaro Pozo
A hybrid dynamic programming for solving a mixed-model sequencing problem with production mix restriction and free interruptions.
Prog. Artif. Intell.
6 (1) (2017)
Joaquín Bautista
,
Alberto Cano
Corrigendum to ''Solving mixed model sequencing problem in assembly lines with serial workstations with work overload minimisation and interruption rules'' [Eur. J. Oper. Res. 210(2011) 495-513].
Eur. J. Oper. Res.
247 (1) (2015)
Joaquín Bautista
,
Alberto Cano
,
Rocío Alfaro
,
Cristina Batalla
Impact of the Production Mix Preservation on the ORV Problem.
CAEPIA
(2013)
Joaquín Bautista
,
Alberto Cano
,
Ramón Companys
,
Imma Ribas
problem using Bounded Dynamic Programming.
Eng. Appl. Artif. Intell.
25 (6) (2012)
Joaquín Bautista
,
Rocío Alfaro
,
Alberto Cano
Incorporating Regularity of Required Workload to the MMSP-W with Serial Workstations and Free Interruption of the Operations.
APMS (1)
(2012)
Joaquín Bautista
,
Alberto Cano
,
Rocío Alfaro
Modeling and solving a variant of the mixed-model sequencing problem with work overload minimisation and regularity constraints. An application in Nissan's Barcelona Plant.
Expert Syst. Appl.
39 (12) (2012)
Joaquín Bautista
,
Alberto Cano
,
Rocío Alfaro
Models for MMSP-W considering workstation dependencies: A case study of Nissan's Barcelona plant.
Eur. J. Oper. Res.
223 (3) (2012)
Joaquín Bautista
,
Alberto Cano
,
Ramón Companys
,
Imma Ribas
A bounded dynamic programming algorithm for the blocking flow shop problem.
CIPLS
(2011)
Joaquín Bautista
,
Alberto Cano
,
Rocío Alfaro
A bounded dynamic programming algorithm for the MMSP-W considering workstation dependencies and unrestricted interruption of the operations.
ISDA
(2011)
Joaquín Bautista
,
Alberto Cano
Solving mixed model sequencing problem in assembly lines with serial workstations with work overload minimisation and interruption rules.
Eur. J. Oper. Res.
210 (3) (2011)